TLI, TSI conform with international audit

Therma Luzon, Inc. (TLI) and Therma South, Inc. (TSI) passed a surveillance audit conducted by TÜV Rheinland Philippines Inc., an affiliate of Germany-based leading technical services provider TÜV Rheinland Group.

TLI and TSI obtained their respective ISO 9001 certifications in 2015 after passing the certification audit. Securing the ISOcertification and conforming to the annual surveillance audits are part of AboitizPower’s commitment to place utmost value in quality processes that enhances a culture of excellence and satisfies customers.

TLI owns the 700-MW Pagbilao thermal power plant located in Quezon Province. TSI, on the other hand, owns and operates the 300-MW (2x150MW) thermal power plant located in Barangay Binugao, Toril District, Davao City and Barangay Inawayan, Sta. Cruz, Davao del Sur.

The annual surveillance audits are being conducted by a third party to ensure the organization continues to conform to the standards of ISO 9001 Quality Management System.

“Our conformance to the ISO 9001 surveillance audit shows that AboitizPower, TLI and TSI put a priority on the continuous improvement of its systems to ensure we provide top quality services and continue to answer the needs of our stakeholders,” said Sebastian R. Lacson, President and COO – Coal Generation Group. “This achievement was made possible by all team members and team leaders who embraced the principles of quality management.”

During the surveillance audit last September, TUV Rheinland Philippines checked whether all processes complied with actions specified by certification standards and if everyone in the organization, especially the top management, supported the quality management system.

The scope of this year’s surveillance audit covers fuel management, ship unloading and coal yard, and the corresponding inter-functional processes of human resources, administration, security, legal and compliance risk management, business systems management, information technology, corporate social responsibility, and finance and accounting.

This year, the Coal Generation Group will expand the scope of certification to include plant operations and maintenance. This will be made possible by the ongoing business process re-engineering that began in June 2016 to prepare the group  for ISOconformance and certification.

“A more ambitious plan is in the pipeline: To achieve conformance and certification to ISO 18001 (occupational health and safety) and ISO 14001(environmental management system)We can attain this goal by adhering to our core values of integrity, innovation, teamwork and responsibility,” Lacson said.

Other News

Building firsts that last: Aboitiz’s tech-driven nation-building

This article was created in partnership with Rappler   What in the world is a ‘techglomerate?’ With countless new concepts popping up in the economic lexicon nowadays, a ‘techglomerate’ may just be one we’re bound to see happening in the Philippines soon. Serving as a combination of the...

Aboitiz Foundation, Subic EnerZone Bring Solar Power to Iram II Elementary School

POWER ON. Aboitiz Foundation and Subic EnerZone light up Iram II Elementary School with solar power during the ceremonial switch-on, bringing sustainable energy to empower students and teachers. Iram II Elementary School in Zambales celebrated an early Christmas gift from Aboitiz Foundation and Subic EnerZone, in...