PSALM issues Certificate of Effectivity on AboitizPower subsidiary’s purchase of Naga power plant co

AboitizPower subsidiary Therma Power Visayas, Inc. (TPVI) has received the Certificate of Effectivity (COE) from the Power Sector Assets and Liabilities Management Corp. (PSALM) to initiate the former’s purchase of the Naga Power Plant Complex located in Naga City, Cebu.

The COE implements the Sept. 28, 2015 decision of the Supreme Court, which upheld the April 30, 2014 award of the facility to TPVI.

“We appreciate the decision of PSALM and we look forward to operating the facility and contribute to securing the energy needs of the Visayas,” AboitizPower President and COO Antonio R. Moraza said. PSALM issued a notice of award to TPVI in 2014 after TPVI posted the highest bid of P1.088 billion for the asset after two failed bidding.

The Supreme Court in a Sept. 28, 2015 decision upheld the validity of PSALM’s public bidding. The High Court reiterated its decision in an Oct. 5, 2016 resolution.

The Naga Power Plant Complex is composed of diesel and coal power plants with a combined capacity of 153.1 MW.

Other News

Building firsts that last: Aboitiz’s tech-driven nation-building

This article was created in partnership with Rappler   What in the world is a ‘techglomerate?’ With countless new concepts popping up in the economic lexicon nowadays, a ‘techglomerate’ may just be one we’re bound to see happening in the Philippines soon. Serving as a combination of the...

Aboitiz Foundation, Subic EnerZone Bring Solar Power to Iram II Elementary School

POWER ON. Aboitiz Foundation and Subic EnerZone light up Iram II Elementary School with solar power during the ceremonial switch-on, bringing sustainable energy to empower students and teachers. Iram II Elementary School in Zambales celebrated an early Christmas gift from Aboitiz Foundation and Subic EnerZone, in...